AI food scanner
Take one picture and get an editable estimate for every visible food, including calories, protein, carbs and fat.
Snap a photo of your meal and get an editable estimate of calories and macros in seconds. Nomi makes everyday food tracking simple.
Free to start. No ads. Nutrition estimates, not medical advice.

It estimates calories, protein, carbohydrates and fat from a meal photo, then lets you review and correct every food before logging. Barcode scanning, manual logging, water, weight and progress tracking are always free.
Nomi turns the fiddly parts of calorie tracking into a quick, reviewable flow.
Take one picture and get an editable estimate for every visible food, including calories, protein, carbs and fat.
Say “only 1 egg” or “cooked in butter.” Nomi updates the meal without another search.
Scan packaged foods, search an open food database, use recent meals or create your own food.
See your daily calorie gauge, protein, carbs, fat and water together in one calm view.
Review 7, 30 and 90-day calorie views, macro splits, weight trends, streaks and badges.
Keep logging without a connection and sync later. AI meal scans require internet access.
Nomi lists each detected food with its estimated portion and nutrition. Hidden oils, mixed dishes and serving size can change the result, so you always stay in control.


Watch patterns without turning every meal into a spreadsheet.


*AI meal scanning and photo analysis require an internet connection.
Portions, recipes, hidden ingredients and photo quality can change an estimate. Review results before logging. Nomi is not a medical device and does not replace advice from a doctor or registered dietitian.
Last updated: October 15, 2026

Download Nomi to scan, review and log meals with less effort.
Scan to download